Drop Down Bridge Build: Part 1

This video will begin a new series about how I am going to rebuild the current lift out bridge on my layout and change into a hinged drop down bridge which will be properly powered. This will hopefully fix the problems of broken tracks and storing the bridge when not in use. I will also wire it correctly so it will have dead tracks on either side of the bridge so keep trains from falling off the layout.